The level 3 tenant improvement scope of work consists of the build-out of the entire 3rd floor, comprising of 20,000 s.f. This initial phase of construction also includes build-out of infrastructure at the roof level pertinent to the future build-out of the 2nd floor. The level 2 TI scope of work consists of build-out of the 2nd floor, comprising of 16,200 s.f. of interior renovations as well as cosmetic upgrades to the already existing and licensed infusion clinic on the south. Level 2 scope of work is to be designed to OSHPD-3 standards and is intended to be licensed. The pharmacy expansion shall comply with USP-797 & USP-800 standards and protocols.