Remodel of MRI 4 and 5 in Taper Building. Scope of work included demolition, removal and installation of new Siemens MRI’s. PNG Builders removed the obsolete MRI equipment through the hospital’s MRI Core Skylight. Riggers carefully raised and lowered equipment with mere inches of clearance via crane. PNG also installed a new architectural ceiling with color changing LED lights along with the new Siemens Sola MRI.