PNG ENERGY

OUR PARTNERS

ABOUT OUR ENERGY SECTOR


Energy’s infrastructure often goes unseen and unnoticed, but it’s part of what keeps our companies, schools, and hospitals running.

Our clients rely on PNG, not only to keep the lights on, but to develop high-quality, dedicated spaces for their most important equipment.

5

Years of Experience

6

Satisfied Clients

507

Mega Watts Production Capacity

OUR PROJECTS


Alamitos BESS Facility

World’s largest Li-Ion Battery Storage Project

Client: Fluence/AES
Size Building: 42,763 s.f.
Substation: 104,253 s.f.
Total Site: 147,016 s.f.
Location: Long Beach, CA
Completion Year: 2021

Located in Long Beach, California, the Fluence/AES Los Alamitos 100MW BESS Facility is one of the world’s largest BESS facilities in operation today. A Battery Energy Storage System, or BESS, is an arrangement of batteries that collect and store energy generated by a power plant, which is later released to the power grid when existing capacities are exceeded.

Alamitos II Battery Energy Storage System

Driving Sustainable Power Through Scalable Innovation

Client: AES Clean Energy
Wattage: 82MW
Engineers: NEI Engineers
Location: Long Beach, CA
Completion Year: 2024

The AES Alamitos BESS II provides 82MW of clean, reliable energy during peak demand. As general contractor, PNG Builders completed new construction of 81 battery containers, 27 inverters and transformers, extensive underground electrical infrastructure, and 162 AC units. The project also included site grading, drainage, a new fire access road, and landscape design.

Watch the Project Video

AES Lancaster Area 127MW BESS

Built for Peak Performance. Designed for a Cleaner Grid.

Client: ABS & AES Clean Energy
Wattage: 127 MW – 4HR – 508MWH
Location: Lancaster, CA
Completion Year: 2022

This 127MW / 4-hour battery energy storage system supports California’s clean energy grid by storing solar power for peak demand. PNG Builders provided site grading, concrete pads, electrical infrastructure, a fire access lane, and fencing. Now serving utilities like Clean Power Alliance and PG&E, the system stores enough energy to power thousands of homes for up to four hours.

Watch the Project Video

Westwing BESS

West Wing BESS: 82.53MW of Advanced Energy Storage

Client: Fluence/AES
Wattage: 61.6MW | 20.93MW
Engineers: NEI Engineers
Location: Peoria, AZ
Completion Year: 2024

At PNG Builders, we are proud to be at the forefront of sustainable energy solutions with our latest endeavor, the West Wing Battery Storage Project. This groundbreaking initiative involves the installation of a cutting-edge Battery Energy Storage System (BESS), comprising a total capacity of 82.53MW.

Watch the Project Video